beautypg.com

Gardner bender, Conduit offset chart 3" conduit offset chart 3, Conduit offset chart 4" conduit offset chart – Gardner Bender B400 Series Eegor Hydraulic Benders User Manual

Page 12

background image

12

PARTS AND SERVICE: For quality workmanship and
genuine Gardner Bender parts, select an Authorized
GB Service Center for your repair needs. Only repairs
performed by an Authorized Service Center displaying
the official GB Authorized sign are backed with full
factory warranty. Contact GB Electrical (414)352-4160
for the name of the nearest GB Authorized Service
Center.

WARRANTY: Gardner Bender warrants its product
against defects in workmanship and materials for 1
year from date of delivery to user. Chain is not
warranted. Warranty does not cover ordinary wear and
tear, abuse, misuse, overloading, altered products or
use of improper fluid.

WARRANTY RETURN PROCEDURE: When
question of warranty claim arises, send the unit to the
nearest GB Authorized Service Center for inspection,
transportation prepaid. Furnish evidence of purchase
date. If the claim comes under the terms of our
warranty the Authorized Service Center will REPAIR
OR REPLACE PARTS AFFECTED and return the unit
prepaid.

REPAIR AND SERVICE INSTRUCTIONS: For repair service and parts contact your nearest Gardner Bender Service Center. The
Gardner Bender Service Center will provide complete and prompt service on all Gardner Bender products.

Gardner

Bender

RPS-0023 0510

To Make an Offset Bend:

1. Make first mark at location determined either by edge of obstacle or

by following “Kick Bend Instruction for Eegor

®

Benders” (page 11).

2. From the “Offset Chart” for the size of conduit to be bent, obtain

measurement (B) for offset height (H) and bend angle desired.

3. Make second mark at distance (B) beyond first mark and on opposite side of conduit as

illustrated above.

4. Place conduit in Eegor

®

bender with first mark aligned with leading edge of U-strap (see figure above) and

make first bend to the desired angle.

5. Advance the bent conduit through the frame assembly of the Eegor

®

bender and rotate the conduit 180°, so

the second mark aligns with the leading edge of the U-strap.

6. Complete offset by making second bend to the exact same angle as the first bend.

Desired

Measurement (B)

Offset (H)

(inches)

(inches)

15°

30°

45°

60°

2

7

5

8

4

15

5

16

6

23

1

16

11

5

8

8

30

3

4

15

5

8

10

38

1

2

19

5

8

13

1

4

12

46

1

4

23

5

8

16

1

16

14

53

15

16

27

5

8

18

7

8

16

61

11

16

31

5

8

21

3

4

16

5

8

18

69

7

16

35

5

8

24

9

16

18

15

16

20

77

1

8

39

5

8

27

3

8

21

1

4

22

84

7

8

43

5

8

30

3

16

23

1

2

24

92

5

8

47

5

8

33

1

16

25

13

16

26

100

5

16

51

5

8

35

7

8

28

1

8

28

108

1

16

55

5

8

38

11

16

30

7

16

30

115

3

4

59

5

8

41

1

2

32

3

4

Desired

Measurement (B)

Offset (H)

(inches)

(inches)

15°

30°

45°

60°

2

7

9

16

4

15

5

16

6

23

8

30

3

4

15

1

2

10

38

1

2

19

1

2

12

46

3

16

23

1

2

14

53

15

16

27

1

2

18

5

8

16

61

11

16

31

1

2

21

1

2

18

69

3

8

35

1

2

24

5

16

20

77

1

8

39

1

2

27

1

8

22

84

7

8

43

1

2

28

15

16

24

92

9

16

47

1

2

32

13

16

25

1

4

26

100

5

16

51

1

2

35

5

8

27

9

16

28

108

55

1

2

38

7

16

29

7

8

30

115

3

4

59

1

2

41

1

4

32

3

16

Desired

Measurement (B)

Offset (H)

(inches)

(inches)

15°

30°

45°

60°

4

15

5

16

6

23

8

30

3

4

10

38

7

16

19

7

16

12

46

3

16

23

7

16

14

53

15

16

27

7

16

16

61

5

8

31

7

16

21

5

16

18

69

3

8

35

7

16

24

1

8

20

77

1

8

39

7

16

27

22

84

13

16

43

7

16

29

13

16

24

92

9

16

47

7

16

32

5

8

24

15

16

26

100

5

16

51

7

16

35

7

16

27

1

4

28

108

55

7

16

38

5

16

29

9

16

30

115

3

4

59

7

16

41

1

8

31

7

8

Desired

Measurement (B)

Offset (H)

(inches)

(inches)

15°

30°

45°

60°

2

7

5

8

4

15

3

8

6

23

1

16

11

11

16

8

30

13

16

15

11

16

10

38

1

2

19

11

16

13

7

16

12

46

1

4

23

11

16

16

1

4

14

54

27

11

16

19

1

16

14

5

8

16

61

11

16

31

11

16

21

7

8

16

15

16

18

69

7

16

35

11

16

24

3

4

19

1

4

20

77

3

16

39

11

16

27

9

16

21

9

16

22

84

7

8

43

11

16

30

3

8

23

7

8

24

92

5

8

47

11

16

33

3

16

26

3

16

26

100

3

8

51

11

16

36

1

16

28

1

2

28

108

1

16

55

11

16

38

7

8

30

13

16

30

115

13

16

59

11

16

41

11

16

33

1

8

2

1

2

" Conduit Offset Chart

3" Conduit Offset Chart

3

1

2

" Conduit Offset Chart

4" Conduit Offset Chart

Offset

or

Rise (H)

Angle

B

B

2nd Mark

1st Mark (on other side of conduit)

P.O. Box 3241 • Milwaukee, WI 53201-3241 • Phone: (414) 352-4160 • FAX (414) 352-2377