beautypg.com

Warning – Hearth and Home Technologies Cinch Pipe & Termination Cap System User Manual

Page 11

background image

Hearth & Home Technologies Inc. • Cinch Pipe & Term Caps • 4033-900 Rev K • 05/05

11

Figure 2.20 Secure with Screws

G. Install Roof Flashing and Vertical Termination Cap

To attach the vertical termination cap, slide the inner collar
of the cap into the inner fl ue of the pipe section and place
the outer collar of the cap over the outer fl ue of the pipe
section.

Secure with three screws into the outer fl ue. Secure the cap
by driving the three self-tapping screws (supplied) through
the pilot holes in the outer collar of the cap into the outer fl ue
of the pipe (see Figure 2.20).

Horizontal
overhang

12

X

20 in.

(508 mm)

Lowest

Discharge

Opening

Termination

Cap

Roof Pitch
is X / 12

Vertical
wall

H (min.) - Minimum height
from roof to lowest
discharge opening.

24 in. min.

(610 mm)

Roof Pitch

H (Min.) Ft.

Roof Pitch

H (Min.) Ft.

Flat to 6/12

1.0*

Over 11/12 to 12/12

4.0

6/12 to 7/12

1.25*

Over 12/12 to 14/12

5.0

Over 7/12 to 8/12

1.5*

Over 14/12 to 16/12

6.0

Over 8/12 to 9/12

2.0*

Over 16/12 to 18/12

7.0

Over 9/12 to 10/12

2.5

Over 18/12 to 20/12

7.5

Over 10/12 to 11/12

3.25

Over 20/12 to 21/12

8.0

* 3 ft. minimum in snow regions

Storm Collar

Roof

Flashing

Figure 2.19 Minimum Height from Roof to Lowest Discharge
Opening

To install roof fl ashing see Figure 2.19.

For installation of vertical termination cap see minimum vent
heights for various pitched roofs (Figure 2.19) .

Fire Risk
Explosion Risk

Inspect external vent cap regularly.
• Ensure no debris blocks cap.

Combustible materials blocking cap may
ignite.

• Restricted air flow affects burner

operation.

WARNING

Storm
Collar

Termination Cap

(1 of three)

Caulk

Screws

Brackets/

Bolts