F. Vertical Penetration Framing

Note: The fi restop spacer is not required if attic insulation
shield is used.

Install Attic Insulation Shield

• Frame opening for attic insulation shield.
• Attic insulation shield may be installed above or below

ceiling (see Figure 2.18).

• Secure with three fasteners on each side.
• Fold tabs at top of attic shield in toward vent pipe. Tabs

must keep vent pipe centered within shield.

• Field construct additional shield height if insulation is

deeper than height of attic shield.

Attic Above

10 in. (254 mm)

Hole should measure

10 in. x 10 in.

(254 mm x 254 mm)

inside to inside

10 in.

(254 mm)

Figure 2.17 Installing Firestop Spacer

3 fasteners

per side

Attic insulation shield

installed below ceiling.

Attic insulation shield

installed above ceiling.

Bend tabs in
around pipe

Figure 2.18 Installing the Attic Insulation Shield

Fire Risk

Keep loose materials or blown insulation
from touching the vent pipe.

National building codes recommend using
attic shield to keep loose materials/blown
insulation from contacting vent.

• Hearth & Home Technologies requires

the use of an attic shield.

WARNING

Install the Firestop Spacer

• Frame an opening 10 in. by 10 in. whenever the vent

system penetrates a ceiling/fl oor (see Figure 2.17).

• Frame the area with the same sized lumber as used in

ceiling/fl oor joist.

• When installing a top vent vertical appliance the hole

should be directly above the appliance, unless the fl ue is
offset.

• Do not pack insulation around the vent. Insulation must

be kept away from the pipe.