beautypg.com

Hearth and Home Technologies BIR50-B User Manual

Page 30

background image

30

Sealant

6 in. min.

1 in.

min.

Storm

Collar

3 ft. minimum

above roof

opening

N. Finish Top

• Slide the storm collar down over the chimney to the top

of the flashing. The storm collar must be installed 1 in. off

the chase top flashing to provide proper ventilation (Figure

8.17).

• Tighten the bolts of the storm collar and seal the storm

collar against the chimney with sealant. Be sure chimney

and offsets are properly supported.

• Apply a non-hardening waterproof sealant around the

chimney at the point where the storm collar will meet the

chimney just above the flashing (Figure 8.17).

• Attach the chimney cap onto the top of the chimney by

setting the female end of the cap onto the male end of the

last chimney section. Secure the cap by using four sheet

metal screws (provided, Figure 8.18.)

• Do not push down from the top portion of the cap as this

may damage the cap. Push from the lower section of the

cap if needed.

• The chimney cap top can be removed for chimney cleaning

as described in the Chimney Inspection & Cleaning section

(Section 3) of this manual.

Termination

Cap

Figure 8.17

Figure 8.18

Heatilator • Birmingham BIR50-B • 4059-682D • 9/12