beautypg.com

Hearth and Home Technologies BIR50-B User Manual

Page 25

background image

25

A MAJOR CAUSE OF VENT RELATED FIRES IS FAIL-

URE TO MAINTAIN REQUIRED CLEARANCES (AIR

SPACES) TO COMBUSTIBLE MATERIALS. IT IS OF

THE UTMOST IMPORTANCE THAT DURACHIMNEY II

BE INSTALLED ONLY IN ACCORDANCE WITH THESE

INSTRUCTIONS.

B. Clearances

Always allow at least a 2-inch clearance between Dura-

Chimney II Pipe and any combustible materials.
• Never fill any required clearance space with insulation or

any other materials.

• Combustible materials include lumber, plywood, sheetrock,

plaster and lath, furniture, curtains, electrical wiring, and

building insulation.

C. Installation Notes

Proper planning for your DuraChimney II installation will

result in greater safety, efficiency, and convenience, as well

as saving time and money. You must use only authorized

DuraChimney II parts to maintain a listed chimney system.

Do

not mix parts or try to match with other products or use

improvised solutions.
• Do

not install damaged or modified parts.

• Practice good workmanship. Sloppy work could jeopardize

your chimney’s safety.

Keep electrical wiring and building insulation away

from all chimneys.

• When deciding the location of your chimney, try to

avoid modifications to roof beams and other structural

components of the building.

If you have any questions, contact either your dealer or

Simpson Dura-Vent directly.

D. Frame Openings

• From the ceiling, drop a plumb bob to the center of the

fireplace’s flue outlet and mark this center point on the

ceiling.

• Mark appropriate cutting lines around the center point.

Cut a square hole in the ceiling. Frame a level, square,

21 in. x 21 in. (533 mm x 533 mm) opening centered over

the hole that you have cut.

• Frame openings at each floor level above the fireplace

(Figure 8.1). These openings are to hold the firestop and

attic insulation shield.

• Locate each opening by dropping a plumb bob to the four

corners of the opening below.

• Maintain the minimum 2-inch clearance/air space. Maintain

the minimum clearances and dimensions as specified in

Table 8.1.

E. Cut Roof Opening

Determine and cut an opening in the roof directly above

the opening below, and at least 4-inches larger than the

chimney’s outside diameter to provide at least a 2-inch

clearance all around the chimney.
• The chimney

must be centered within this opening and

maintain the minimum 2-inch clearance to combustibles.

F. Install Firestop

A firestop is required on each floor penetration in multi-

story installation. Building Codes require a firestop at every

floor/ceiling level, including where the chimney penetrates

into the attic. Figure 8.1 shows a typical 2-story installation

with an attic.
Note: a firestop is

not installed where the chimney pen-

etrates through the roof.
• The firestop is installed on the underside of the ceiling/floor

framing (Figure 8.2).

• Use a minimum of one 8 penny nail or one 1-1/4” wood

screw per corner.

Framing

Figure 8.2

Heatilator • Birmingham BIR50-B • 4059-682D• 9/12