A. Mantel and Wall Projections
WARNING! Risk of Fire! Comply with all minimum clear-
ances as specifi ed. Framing closer than the minimums list-
ed must be constructed entirely of noncombustible materi-
als (i.e., steel studs, concrete board, etc.) Failure to comply
could cause fi re.
Combustible Mantels
Figure 13.3 Combustible Mantel Leg or Wall Projections
(Acceptable on both sides of opening)
Figure 13.4 Non-Combustible Mantel Leg or Wall Projections
(Acceptable on both sides of opening)
Figure 13.1 Minimum Vertical and Maximum Horizontal
Dimensions of Combustibles
Figure 13.2 Minimum Vertical and Maximum Horizontal
Dimensions of Non-Combustibles
5
6
7
8
9
10
3
4
5
12
11
10
9
8
7
6
TOP OF HOOD OR FIREPLACE OPENING
4
12
13
11
32
CEILING
2-7/8 IN.
MINIMUM
1/2 IN.
MINIMUM
TOP VIEW
3 FT.
MAXIMUM
Note: Clearance from
opening Alcove/Mantel leg.
1/2 in.
SHEETROCK
3-1/2 in.
1/2 in.
NON-COMBUSTIBLE ZONE
NON-COMBUSTIBLE
BOARD SHIPPED
WITH APPLIANCE
Note: All measurements are in inches.