D. Mantel and Wall Projections
WARNING! Risk of Fire! Comply with all minimum clear-
ances as specifi ed. Framing or fi nishing material closer than
the minimums listed must be constructed entirely of noncom-
bustible materials (i.e., steel studs, concrete board, etc).
Combustible Mantels
5
6
7
8
9
10
3
4
5
12
11
10
9
8
7
6
TOP OF HOOD OR FIREPLACE OPENING
4
12
13
11
32
CEILING
2-7/8 IN.
MINIMUM
1/2 IN.
MINIMUM
TOP VIEW
3 FT.
MAXIMUM
Note: Clearance from
opening Alcove/Mantel leg.
5-3/8 IN.
MINIMUM
3 IN.
MINIMUM
TOP VIEW
UNLIMITED
Note: Clearance from
opening Alcove/Mantel leg.
Figure 5.6 Clearance to Wall Projection
(Acceptable on one side of opening.)
1/2 in.
SHEETROCK
3-1/2 in.
1/2 in.
NON-COMBUSTIBLE ZONE
NON-COMBUSTIBLE
BOARD SHIPPED
WITH APPLIANCE
Figure 5.4 Non-Combustible Zone
Note: All measurements are in inches.
Figure 5.3 Minimum Vertical and Maximum Horizontal
Dimensions of Combustibles
Figure 5.5 Combustible Mantel Leg or Wall Projections
(Acceptable on both sides of opening)