CL36D AND CR36D INSTALLATION INSTRUCTIONS

Figure 21 - Installing a TR344 Round Termination Cap

Figure 22 - Installing a TR342 Round

Telescoping Termination Cap

2. Chase Top

Construct a chase of desired materials maintaining

a minimum 2” air space around the chimney.

3. Termination Cap

a. Install the chimney sections up through the chase

enclosure. When using a TR344 round

termination cap, the uppermost top section of

pipe must extend 6” above the top of the chase

collar to allow installation of the storm collar and

termination cap. See Figure 21.

b. For installations utilizing a TR342 telescoping

round termination cap, the uppermost chimney

section must be below the top of the chase top,

but not more than 14½” below the top of the chase

top flashing collar. See Figure 22.