beautypg.com

PLANET BSP-300 User Manual

Page 26

background image

                                                           

 

User’s Manual of BSP-300

 

 

 

25

the load. It requires the charging from the PV panel so as to increase the battery voltage to be
above the value for low­voltage reconnection (LVR) and thus the PoE device can be recovered.

Absorption Voltage and Float Charging Voltage:

According to the characteristics of the battery,

the user can set the required charging voltage. The absorption charging will last for 60 minutes.

Number of Charge Times:

When the battery voltage is lower than LVD, the battery will be

charged through the PV panel. After the battery voltage is higher than LVR, the battery operation is
recovered and the number of charging times is increased by +1.

Load Voltage:

Set the maximum and minimum voltages required for the lighting apparatus so as

to determine the PWM output voltage (Max. Voltage-Min. Voltage) * Percentage + Min. Voltage =
Output Voltage.

NOTE:

The gray zone is for the retention function and does not need to be set in the
BSP-300.

PV Panel Voltage:

In the Auto/Manual modes, the turn­on and turn­off times are determined by

the PV panel voltage. This voltage value can be adjusted according to the demand.

NOTE:

The gray zone is for the retention function and does not need to be set in the
BSP-300.