4 rack mounting – PLANET GSD-808HP2 User Manual
Page 12

12
Step 4: Connect your Switch to 802.3at / 802.3af complied Power Devices (PD)
and other network devices.
A. Connect one end of a standard network cable to the 10/100/1000 RJ-45
ports on the Front of the Switch.
B. Connect the other end of the cable to the network devices such as printer
servers, workstations or routers…etc.
Note
Connection to the Switch requires UTP Category 5 network cabling
with RJ-45 tips. For more information, please see the Cabling
Specification in Appendix A.
Step 5 : Supply power to the Switch.
A. Connect one end of the power cable to the Switch.
B. Connect the power plug of the power cable to a standard wall outlet.
When the Switch receives power, the Power LED should remain solid Green.
2.4 Rack Mounting
To install the Switch in a 19-inch standard rack, follow the instructions described
below.
Step 1: Place your Gigabit Ethernet Switch on a hard flat surface, with the front
panel positioned towards your front side.
Step 2: Attach a rack-mount bracket to each side of the Switch with supplied
screws attached to the package. Figure 2-5 shows how to attach brackets
to one side of the Switch.
Figure 2-5: Attaching the Brackets to the Switch
You must use the screws supplied with the mounting brackets.
Damage caused to the parts by using incorrect screws would inval-
idate the warranty.