beautypg.com

Table 6: blower delay settings for heating cycles, Iii. initial operation of the furnace, A. initial startup – Thermo Pride Gas/Propane Furnace Induced Draft Highboy/Counterflow/Horizontal MHA1 User Manual

Page 32

background image

All installations and services must be performed by qualified service personnel.

29

Table 6: Blower delay settings for heating cycles

To delay fan

turn-on by:


Set Switch
#1 #2

15 sec.
30 sec.

*45 sec.

60 sec,

Off Off
Off On

On Off
On On

To delay fan

turn-off by:

Set Switch

#3 #4

60 sec.
90 sec.

120 sec.

*180 sec.

On On

Off On

On Off
Off Off

*Factory settings for optimal performance


III. Initial Operation of the Furnace:

A. Initial Startup:

:

Turn off power to furnace. Before the gas piping system is placed

into service, it must have been leak tested by a qualified heating
contractor.
(Refer to the General Gas Piping Requirements section of
this manual regarding the installation and leak testing of gas piping).

For initial start-up of the appliance after installation, it may be

necessary to purge the air out of the gas line. A qualified heating
contractor should do this. If excessive gas escapes when purging
the gas supply at a pipe union joint, allow the gas to disperse for at
least 15 minutes before attempting to start the appliance. LP gases
are especially dangerous because the specific gravity of LP gases
allows them to accumulate at ground level at possibly explosive
concentrations.

Review the following items before the initial startup. It may be helpful to review
the Sequence of Operations in Appendix B of this manual, also.

a. Check all wiring for loose connections and proper hook-up. Refer to the

connection diagram.

This manual is related to the following products: