Installing the mt2 module, Figure 1. removing the cover – EchoStar Over-the-Air Module MT2 User Manual
Page 4

Page 3
• These instructions assume you have an over-the-air antenna
suitable for your area already installed in your system. Refer to 
www.antennaweb.org or a local retailer for assistance in choosing 
and peaking an over-the-air antenna.
Installing the MT2 Module
1.
Unplug the receiver’s power cord from the electrical outlet.
Unplug the receiver’s power cord from electricity anytime you 
install or remove the OTA module. Doing so reduces the 
danger of electrical shock, which could damage the module 
and the receiver, and injure or kill you. 
2.
Look at the back panel of your satellite receiver, and locate the 
cover on the left side of the back panel. Remove the two screws 
attaching the cover to the receiver (see Figure 1). Keep the screws 
for use in installing the module.
Figure 1. Removing the Cover
OTA Module.book Page 3 Thursday, July 3, 2008 4:35 PM
