beautypg.com

Installation – Empire Comfort Systems BVD36FP32 User Manual

Page 10

background image

Page 10

19400-3-0406

Framing dimension "A" includes a three inch clearance

for standoffs on firebox.

Framing and Finishing

1. Choose unit location.

2. Frame in fireplace with a header across the top. It is important

to allow for the finished face thickness when setting the depth

of the frame. See Figures 9 & 11.

3. Attach fireplace to framing using (4) adjustable nailing flanges.

Preset depth to suit facing material (adjustable to 1/2", 5/8" or

3/4" depths).

4. Use (8) 1/2" hex-head screws supplied in hardware package

to screw through slotted holes in nailing flanges, then screw

into pre-drilled holes on fireplace side. Measure from face

of fireplace to face of the nailing flanges to determine final

depth.

Vent Pipe Clearance

Note: Maintain one inch (1") of clearance around vertical vent pipe.

Follow the B-Vent system instructions for installation requirements

and clearances. Failure to follow the B-Vent manufacturer's

instructions may cause improper draft and possible fire hazard.

Figure 10

B-

TO

COMBUSTIBLES

NAIL OR OTHER SUITABLE FASTENER

MOUNTING

BRACKETS

Install the Fresh Air Kit - BVA1

A fresh air kit is available as an optional feature with this appliance.

The fresh air kit helps to decrease the amount of room air taken by

utilizing outside air for combustion. It is strongly recommended

that it be installed. Installation of the fresh air kit should be

performed at the framing stage of the fireplace installation.
The fresh air kit installs on the left side of the fireplace.

To install the BVA1 fresh air kit, refer to the installation

instructions provided with the kit.

Note: The outside air kit can terminate at any level with

the exception that it must terminate at least 1 ft below the

vent termination cap. The fresh air kit inlet hood should be

positioned at least 2 ft above the ground level, in a manner that

will not allow snow, leaves, etc. to block the inlet.

WARNING: Exhaust products of gasoline engines are

hazardous. The outside air must not be taken from a

garage space, attic spaces, basements, or above the roofing

where other heating appliance, fans, or chimneys exhaust

or utilize the air.

Figure 9

Framing (Figure 11)

Fireplace framing can be built before or after the fireplace is set in

place. Framing should be positioned to accommodate wall covering

and fireplace facing material. The fireplace framing should be

constructed of 2 x 4 lumber or heavier. The framing headers may

rest on the fireplace standoffs. Refer to Figure 11 for minimum

framing dimensions.
CAUTION: MEASURE FIREPLACE DIMENSIONS AND

VERIFY FRAMING METHODS, AND WALL COVERING

DETAILS BEFORE FRAMING CONSTRUCTION

BEGINS.

INSTALLATION

This manual is related to the following products: