Ericsson EDN312 User Manual
Page 17
Verifying the Installation
1/1531-HSD 101 41 Uen A 2004-01-30
13
This method is similar to activating real subscribers. In order to use this
method the following preconditions have to be fulfilled:
•
The PEM installation has succeeded
•
The PEM configuration of the network has been done
•
The servers in the network are running
•
All registration has been transferred to the PEM
The Service Configuration Manager is used for this task.
Alternatively the Bulk Configuration Manager can be used instead of the
Service Configuration Manager and may simplify the task of configuring an
end-user with a service for each line; please see the Bulk Configuration
User’s Guide for further details.
Please refer to Local Craft Tool User’s Guide and the PEM User’s Guide for
detailed information of how to use them.
Table 3
Verification with the ECN320 Local Craft Tool
Verification Activity
Comments
Perform continuity check on each line from
the Exchange MDF to the Line MDF
Best to perform after rewiring and
before installing nodes
Verify that the green LED is lit on the IP
DSLAMs
Green – The IP DSLAM has booted
and received an IP address and SW
Verify (if possible) that the ECN320 switch
port where the IP DSLAMs are connected,
indicates active Ethernet connection
Active Ethernet connection is
verified
Recommended to perform check on each
ADSL line
Testing the IP DSLAM functionality
Recommended to perform continuity check
on each POTS or ISDN line
Test that the new installation has
not affected the old services
Start the Status Manager and use the Flash
LEDs button to verify the MDF position of the
IP DSLAMs (verification of the registration)
Test of the registration process