Checklist for Completed Installation

___ 1. All items unpacked and checked.
___ 2. Proper clearances for service access maintained around equipment.
___ 3. Equipment is level and mounting fasteners are tight.
___ 4. Piping completed to refrigerant loop.
___ 5. All piping connections are tight.
___ 6. Piping routed to prevent chafing and rub-through.
___ 7. Piping has been evacuated and refrigerant charge added (if required).
___ 8. Line voltage to power wiring matches equipment nameplate.
___ 9. Power wiring connections completed, including earth ground.
___ 10. Power line circuit breakers or fuses have proper ratings for equipment installed.
___ 11. Control wiring connections completed.
___ 12. All wiring connections are tight.
___ 13. Foreign materials have been removed from area: in and around all equipment installed

(shipping materials, construction materials, tools, etc.).

___ 14. Fans and blowers rotate freely and in the proper direction.
___ 15. Blank startup sheet has been sent with the evaporator unit and is ready to be completed by

the installer.

Table 21

Electrical data - Quiet-Line models (95°F/35°C) 50Hz

Model #

Nominal

Capacity

Tons

* Electrical

Characteristic

Input Voltage-Phase

220-1

200/230-3

380/415-3

13

1

FLA

19

1.5

FLA

26

2

FLA

12.3

4.8

36

3

FLA

18.0

6.9

41

3.5

FLA

17.3

8.4

66

5

FLA

22.5

12.4

95

8

FLA

* FLA = Full Load Amps