beautypg.com

Jordan Valve Mark V-100 Series Control Valve User Manual

Page 6

background image

-6-

Assembly Continued,

5.

Gasket installation

5.1

2 In Body – Slip the gasket (key 12)

over the guide post (key 13) and

hold the wave spring, if used, between

the ball and the body. Insert

the guidepost assembly into the

body, wave spring, and ball valve.

5.3

3, thru 8 inch bodies - Slide both the

gasket (key 12) and the spring retainer

washer (if required) over the guide post

(key 13) and hold the wave spring, if

used, between the V-ball and the body.

Insert the guidepost assembly into the

body, wave spring, and ball valve.

6.

Insert the retainer for the guidepost and secure

with retainer nuts; for body sizes 2-through

8 inch. Tighten nuts to the recommended

torque from table 1.

7.

Insert groove pin (key 10) to lock the drive shaft

and V-ball connection. The pin should enter

from the large hole and go towards the

smaller diameter hole. The pin

should be flush with both ends.

8.

Replace the packing box ring (key 18) and

install the new packing (key 6).

9.

Install the packing follower (key 15) and replace

the packing flange if used. Replace and tighten

the packing flange nuts until they are finger

tight. When under actual flow conditions the

nuts will need additional tightening to

control leaking.

10.

Following the instructions under ‘Ball Seal or

Flow Ring Maintenance”, replace the ball seal or

flow ring.

11.

Reconnect the actuator using the actuator orien-

tation that was noted previously. The cap

screws (key 4) and hex nuts (key 5) should be

torqued to the values listed in Table 1.

12.

Install the lever using orientation that was noted

previously and the identifying marks from figure

3.

13.

Use the appropriate actuator instructions for

remaining mounting instructions and the travel

adjustment.

Bushing Replacement

Jordan Valve does not recommend replacing bushings

in the field. The procedure is difficult and may cause

permanent damage to the V-ball. If replacement of the

bushing in the field is necessary, follow the instructions

that follow and the dimensions in Figure 5.

Note:
Do not heat the valve in an attempt to ease the
replacement procedure of the body bushing. Heat-
ing the valve will cause the plastic-lined material to
release fluorine gas, which is extremely hazardous,
causing; poisoning, suffocation, and burns.

Figure 2.

V-Ball showing Groove Pin Hole

M

ark

V-100 S

erieS

C

ontrol

V

alVeS

Taper Pinhole

Key Number

Body Size, Inches

Bolt Torque

ft•lb

N•m

Guide Post

Retainer Nut

Key 6

2

27

37

3

43

58

4

65

88

6

95

129

8 and 10

200

271

12

95

129

Cap Screw

Key 11

2-6

65

88

8-12

100

136

Table 1,

Recommended Bolt Torque