beautypg.com

Jordan Valve Mark V-100 Series Control Valve User Manual

Page 3

background image

-3-

Solid Ring Packing Continued,

1.

Remove the actuator cover.

2.

Remove the lever.

3.

Disconnect the actuator and body cap screws

(key 4) and hex nut if used (key 5).

4.

Remove the packing flange nuts (key 3), pack

ing flange, if used, and packing follower.

5.

Remove the packing rings (key 6) with a formed

wire hook. To remove the TFE V-ring packing,

the wire hook should have a sharp end to allow

you to pierce the packing for removal.

6.

Clean the packing box, all metal parts and com-

plete all required maintenance.

7.

Replacing single packing

7.1

Replace the packing box ring

(key

18).

7.2

Next, replace the packing rings (key 6).

8.

Replacing double packing arrangements

8.1

Replace the packing box ring

(key

18).

8.2

Replace one half of the total number of

packing rings (key 6).

8.3

Install the packing washer, if used.

8.4

Replace the lantern ring and the remain

ing packing rings.

8.5

If used, replace the packing

8.6

Install the packing follower (key 15)

8.7

Replace the packing flange, if used

8.8

Replace and tighten the packing flange

nuts until they are finger tight.

9.

Reconnect the actuator following the previously

noted orientation.

10.

Replace the cap screws (key 4) and hex nuts

(key 5) using the torques from table 6.

11.

Follow the actuator instruction manual to com

plete the actuator assembly and to set the travel

adjustment.

12.

After the valve is placed in service, the packing

flange nuts may require retightening to prevent

leakage.

Ball Seal or Flow Ring Maintenance

Caution must be used when working near the
V-ball. The V-Ball closes with a shearing, cutting mo-
tion and can cause personal injury or property dam-
age if objects become caught in a closing valve. Be
sure to keep the path of the V-notch valve clear while
stroking the valve.

Disassembly:

1.

Isolate the valve from the line.

1.1

It is necessary for the removed valve to

be positioned so that the seal

ring or flow ring is pointed upward

1.2

Ensure that V-ball (key 21) is in the open

position.

2.

Remove the cap screws that secure the seal

protector ring in place.

3.

Carefully remove the ring from the body,

ensuring that the surface of the ball is not nicked

or scraped.

4.

Remove the O-ring (key 24), if used.

5.

Mark the position of the ball seal and the valve

body, so that it can be returned to its

original position when it is reinstalled.

6.

Carefully remove:

6.1

The bi-directional metal or TCM ball seal

(key

23)

6.2

The back-up ring

6.3

Shim seals

7.

Clean all parts and inspect for damage.

Installation of Metal, Bi-directional Metal or
Heavy-Duty Composition (TCM) Ball Seal

1.

Inspect the sealing surface of the valve body

for nicks and scratches that will prevent

the shims from sealing.

2.

Turn the V-ball to the closed position and

install the appropriate number of shims

(Key 20) from table 3. For the bi-directional

metal ball seal, use a 1/1000-inch or 1/4 mm

thick test shim. A piece of paper would

be a suitable alternative.

Place the test shim across the ball face.

M

ark

V-100 S

erieS

C

ontrol

V

alVeS