3  Maintenance Schedule

Maintenance manual

TCS-CP-WH-en-10

13

1 year

Concrete station

• Carry out leakage tests

– Enclosure openings
– Covers
– Paint

• Clean air inlets and outlets
• Check doors and locking systems
• Check insulated conduit
• Check exterior for concrete damage
• Check covers
• Check that the cable vault is watertight, if

necessary seal with bitumen

• Check support structure for damage, e. g.

exposed steel, and apply rust protection if
required and cover with layer of cement

• Check that enclosure openings are intact and

replace if not tight

Concrete station /
steel station

• Check doors and locks

– Carry out function test
– Apply lubricants
– Make repairs to silicone sealing
– Reset hinges

• Check paint cover on exterior and roof
• Check paint cover on interior walls and on station

floor

• Repair damage to paintwork

2 years

Steel station

• Check exterior of steel station for corrosion

LV/HRC fuse
switch-disconnector

• Check LV/HRC fuses for discolouration

AC circuit breaker

• Check the AC circuit breaker for functionality

Transformer for auxiliary
power supply

• Check torque of screw connections

Interlocking

• Check that interlocking works

Transformer fan

• Check that transformer fan works

5 years

MV switchgear
Ringmaster

• Check safety system

Interval

Component

Activity