ShoreLand'r SLIB55TBBL User Manual
Page 12

Midwest Industries, Inc. Ida Grove, IA 51445 800-859-3028
www.shorelandr.com
0004169
Page
12
of
14
Rev
A
10/20/2010
POST LOAD GUIDES (Detail C)
Locate the post load guides. Position one of
them as shown on the rear cross member of
the trailer frame. Drop a 1/2” X 3-9/16” X 7-
1/4” square U-bolt down through the holes in
the load guide so one leg of the U-bolt is on
each side of the cross member. Place on an
adjustable bunk bracket clamp so the legs of
the bracket fit up around the cross member.
Place on one of the 1-1/2” wide X 5” long
straps over the legs of the U-bolt. Next place
a cup washer onto the U-bolt legs so the cup
is down. Place on a 3” compression spring on
each leg of the U-bolt, then a second cup
washer on each U-bolt leg so the cup is up.
Secure the parts on the U-bolt legs with 1/2
flange lock nuts. Tighten.
Note that the load guide can be slid in or out
from the center line of the trailer to
accommodate for different width boats. Adjust
for width once the boat is on the trailer.
Repeat the above process on the other load
guide.
If additional clearance is need between the
boat and the trailer it is recommended that
the following riser kits be used:
SS1043 on the front bunk will allow up to 3”
of additional space.
SS1000 used on the rear pivot will allow up
to 2” of additional clearance between boat
and trailer.