beautypg.com

ShoreLand'r SL82TAL User Manual

Page 7

background image

Midwest Industries, Inc.

Ida Grove, IA 51445

800.859.3028

www.shorelandr.com

0003356

REV G 4/28/06

Page 7

Rocker Bogie

Locate the rocker bogie as shown on page 6. Note there is a grease zerk in

the center bushing of the rocker bogie. This is necessary so that it can be

serviced in the field when needed. Position the rocker bogie into the center

mounting channel of the spring bracket. The rocker must be positioned

with the hole locations as shown for proper operation. Align the center

hole of the rocker 60205 with the hole in the center mounting channel of

the spring bracket. Insert a 3/4” x 5-1/2” stainless steel hex bolt from the

outside inward as shown and secure with a 3/4” stainless steel hex lock

nut. Tighten. Repeat on the other rocker bogie.

Springs

Position the axles so they are proper-

ly aligned with the trailer. The disc brake

calipers are on the back side of the axle.

Block the axles so they are approximately

12” above the floor. Drop two 1/2” x 2-9/16” x

6-1/2” stainless steel U-bolts down over the

axle, then down through the holes in the spring

mounting plate that is welded to the axle.

Position a spring so that the eye end of the

spring is to the front of the trailer. Raise

the spring up between the U-bolts, slip on

another spring plate and secure with four

1/2” stainless steel hex lock nuts. Do not

tighten until after the springs are mounted

into the trailer frame. Repeat on the other end

of this axle, then on the second axle.

Axles

Place the eye of the springs mounted on the

rear axle into the rear of the rocker bogies. Align

holes and secure in the rocker bogies with a

9/16” x 4-3/4” stainless steel hex bolt and 9/16”

stainless steel hex lock nut. Raise the rear of the

spring and axle assembly up into the rear spring

bracket channel. Place a spring support chan-

nel (Item #4) under the spring. Align the holes

and place another 9/16” x 4-3/4” stainless steel

hex bolt through one side of the spring support

channel and one side of the spring brack-

e t c h a n n e l . P l a c e a s p r i n g b r a c k e t

bushing on the top side of the spring,

align with the bolt just inserted. Insert the

bolt through the bushing, spring bracket

channel and the spring support channel. Secure

with a 9/16” stainless steel hex lock nut.

Place the eye of the springs mounted to

the front axle into the front spring bracket

channel for the front axle. Secure as above using

a 9/16” x 3-3/4” stainless steel hex bolt and 9/16”

stainless steel hex lock nut. Raise the rear of the

springs up into the front side of the rocker bogies.

Raise the spring up and secure in place with 9/16” x

4-3/4” stainless steel hex bolts and 9/16” stainless

steel hex lock nuts. Tighten.

Tighten all axle U-bolts and spring bolts.

This manual is related to the following products: