beautypg.com

8 universal pecking (cycle 205, din/iso: g205), Cycle run, Universal pecking (cycle 205, din/iso: g205) – HEIDENHAIN TNC 640 (34059x-02) Cycle programming User Manual

Page 86

background image

Fixed Cycles: Drilling

3.8

UNIVERSAL PECKING (Cycle 205, DIN/ISO: G205)

3

86

TNC 640 | User's Manual Cycle Programming | 5/2013

3.8

UNIVERSAL PECKING (Cycle 205, DIN/
ISO: G205)

Cycle run

1 The TNC positions the tool in the tool axis at rapid traverse

FMAX to the entered set-up clearance above the workpiece
surface.

2 If you enter a deepened starting point, the TNC move at the

defined positioning feed rate to the set-up clearance above the
deepened starting point.

3 The tool drills to the first plunging depth at the entered feed rate

F.

4 If you have programmed chip breaking, the tool then retracts

by the entered retraction value. If you are working without
chip breaking, the tool is moved at rapid traverse to the set-up
clearance, and then at

FMAX to the entered starting position

above the first plunging depth.

5 The tool then advances with another infeed at the programmed

feed rate. If programmed, the plunging depth is decreased after
each infeed by the decrement.

6 The TNC repeats this process (2 to 4) until the programmed

total hole depth is reached.

7 The tool remains at the hole bottom—if programmed—for

the entered dwell time to cut free, and then retracts to set-up
clearance at the retraction feed rate. If programmed, the tool
moves to the 2nd set-up clearance at

FMAX.