beautypg.com

Smart Avi SignagePro User Manual

Page 39

background image

6. Schedules, Tasks, Templates, RSS

35

(c) 2010 SmartAVI

figure 6.3.2

a. To do this you must use your mouse to highlight one of the tasks you created in the
previous step. (figure 6.3.2)
b. With the task highlighted click the arrow just to move the task into your schedule. (figure
6.3.2)
c. The task within the schedule will run in order starting from the task at the top of the list.
You can arrange tasks by selecting them and using the up and down buttons.
d. You also have the option of deleting the task from the schedule or clearing the schedule

This manual is related to the following products: