Removal and repair, Sccg30 & sccp30 service manual – Scotsman SCCG30 User Manual
Page 29
15. Lift evaporator platen up and tilt back enough
for bin assembly to clear the base.
16. Remove air baffle.
17. Unplug wire harness connector (at back of bin).
18. Remove 1 screw at each corner of the base.
19. Lift bin assembly off the base.
Note: Prop evaporator assembly up. A 3' length of
3/4" PVC tubing with one end inserted into the cup
mold and the other against the base will hold it up.
The hot gas valve, fan motor, condenser and
compressor are now exposed for service.
September 2009
Page 28
SCCG30 & SCCP30
Service Manual
Air Baffle
This manual is related to the following products:
See also other documents in the category Scotsman Equipment:
- Prodigy Plus D Series (23 pages)
- C1030 (23 pages)
- Prodigy Plus D Series Remote Condenser Modular Cuber (26 pages)
- N1322 (54 pages)
- DC33 (26 pages)
- C2148W (25 pages)
- C1848 (22 pages)
- C2148R (26 pages)
- CU3030 (104 pages)
- EH430 D (31 pages)
- N1322 (24 pages)
- N1322 (18 pages)
- N1322L (18 pages)
- AFE424 (15 pages)
- AFE400 (25 pages)
- C2648R (25 pages)
- CU0920 (17 pages)
- CU0920 (31 pages)
- CB1030 (43 pages)
- CU3030 (18 pages)
- CU50 (16 pages)
- FME804 Installation (32 pages)
- FME804 Installation (16 pages)
- NB1322 (37 pages)
- HD30 (18 pages)
- HID540 Service Manual (41 pages)
- HID540AW (20 pages)
- MDT4F12 (16 pages)
- SCCP30 (15 pages)
- SCN60 (18 pages)
- SCN60 (38 pages)
- MDT5N40 (16 pages)
- TDE650 (33 pages)
- SCR33 (20 pages)
- ECC1800 (4 pages)
- SCCP50 (33 pages)
- SCV32 (16 pages)
- 2000 Prodigy Eclipse (50 pages)
- EH222 with ECC (57 pages)
- Nugget Ice Machines (22 pages)
- CME650 (24 pages)
- CD200 (19 pages)
- CME1656 (43 pages)
- CME456 (42 pages)