5 assembly and installation, Assembly and installation, Remko rkl – REMKO RKL 300 User Manual
Page 12: 5assembly and installation
5
Assembly and
installation
Assembly and unit installation instructions
The unit is positioned at the desired location with
the discharge side pointing into the room. When
positioning, observe the following instructions:
n
After unpacking the unit let it sit on its transport
rollers for at least 5 minutes before you switch
it on.
n
Set the unit down in a stable position on a level
and firm floor. If the floor is uneven then this
can lead to vibrations and disturbing noises.
Fig. 5: Unit installation
NOTICE!
There must be a minimum clearance of 20 cm
between the rear of the unit and the wall.
n
All extensions to the power supply must be of a
sufficient cable size and must only be used
fully rolled out.
Fig. 6: Power supply
n
Check whether the stopper in the condensate
drain is present and correctly installed. There is
a risk of uncontrolled condensate leakage after
commissioning.
1
1
Fig. 7: Condensate drain
1: Condensate drainage with stopper
n
Never operate the unit without the air inlet filter.
Otherwise, the fins of the heat exchanger can
become dirty and the unit loses performance.
1
2
Fig. 8: Air inlet filter
1: Recirculated air filter
2: Exhaust air filter
n
Ensure that persons and sensitive objects,
such as plants, are not placed directly in the air
flow emerging from the unit.
In addition, with direct solar radiation close the
curtains and blinds and keep the windows and
doors closed during operation.
REMKO RKL
12