Nortec ME Direct Feed Installation User Manual
Page 15
15
Installation
2. Mounting the tank:
• Insert the tank into the AHU/air duct.
WARNING!
Use an appropriate lifting device or handle the tank with the help of another person to posi-
tion it inside the duct. It is the customer's responsibility to ensure that operators are trained in
handling heavy goods and to enforce the relevant lifting regulations.
• Align the tank to the centre of the duct and perpendicular to the duct walls. When aligned fix tank
upstands to the duct floor.
CAUTION!
The installer must take appropriate measures to ensure that the duct floor remains water proof
once the tank upstands has been fixed to the duct floor.
• Then, adjust the tank with the leveling nuts lengthwise and crosswise exactly horizontal using a
level. When adjusted, tighten the leveling nuts.
Fig. 5: Mounting the tank
=
=