Nortec LiveSteam v.2 User Manual
Page 25
LS Installation Manual | 22
Step 10
1. Tighten Valve Mounting Nut
compressing Lock Washer.
2. Tighten Stainless Steel Jam
Nut on actuator against the
Spacer.
Figure 33: Step 10
Step 11
1. Release actuator by loosening locking mechanism.
2. Refer to wiring diagram for wiring instructions.
3. Apply power to actuator and ensure proper operation of valve and actuator.
4. Ensure proper response to control signal.
5. The actuator should be putting tension on the stem and holding it closed (up position)
This manual is related to the following products: