Appendix – MEGA Corp. MHT175-CAT777-OPS-1 User Manual
Page 34
MHT175-CAT777(G)-1
1 Aug 2012
SECTION 6
Appendix
6-8
MHT175-CAT777(G)CL-1
1 Aug 2012
5. Hoist Control Lever – HOLD
UNLOADING (Moving)
It is highly recommended a dozer be available to keep
dump entry and exit paths level during stockpile
operations.
1. When entering stockpile to dump, find a level area
that will not require any turning once the dump has
started.
2. The truck should be locked in first or second gear.
3. Determine a safe ground speed for the dump pass
based on environmental/road conditions, stockpile
route, and appropriate material flow to prevent
trailer axle high centering or hitch over oscillation.
4. After the unit has entered the stockpile and is
locked in the correct gear and is in a straight line
with the desired ground speed established, the
dump doors can be opened to an intermediate
position.
N-7