Adjusting the ejector rollers, Transfer bridge – MBM Corporation 352S User Manual
Page 40

Operator's Manual
multipli 35
Buckle Fold Unit 35/2 and 35/4
Mathias Bäuerle GmbH
43
Adjusting the
Ejector Rollers
The ejector rollers on the delivery shafts must be set so that they are running on top of
each other (1). An adjustment is only necessary when the sheets are no longer guided
properly after a change of format. To adjust:
•
Turn the handwheel until the set
screws of the ejector rollers are
visible (2).
•
Loosen the screws (2) with a 2-mm
Allen key.
•
Shift the ejector rollers to the required position. Tighten the set screws.
1
2
Transfer Bridge
When a second fold unit is used, a transfer
bridge (3) is attached to the delivery of the
first fold unit.
When the bridge is used for the first time,
check whether there is a drive gear (4) on
the lower delivery shaft.
3
4
Drive for standard delivery
6
If it is not installed, proceed as follows:
•
Loosen the two Allen screws (5) on the gear.
The screws are secured against loss.
Now it is possible to separate the two parts of the gear.
•
Connect both parts of the gear on the lower ejector shaft (6).
•
Connect the bridge (3).
Make sure that the cutouts of the bridge
are properly seated on the pins (7) and
the crossbar (8).
•
Check that the drive gear meshes with
the gear of the bridge.
•
Tighten the two Allen screws (5).
5
5
6
7
8
3