Guralp Systems CMG-1T User Manual
Page 31
![background image](https://www.manualsdir.com/files/788407/content/doc031.png)
Operator’s Guide CMG-1T Ocean Bottom
Seismometer
September, 1999, Issue C Section 9,
Page 1
9.
MOUNTING OF THE LEVELLING SYSTEM
Three fixing bolt positions are provided to fix the levelling system within a
pressure housing, as shown in the diagram.
The positions of the mounting holes are given in the following drawings
together with a suggested method of electrically isolating the levelling system
from it’s casing.