Stringing the frame – GAMMA 5800 Els STRINGING MACHINE 2 POINT SC MOUNTING (Issue 1 - June 2006) User Manual
Page 15

14
Clamping the First Main String
Secure the tensioned main string using the
remaining fixed clamp. Repeat the proce-
dure for all of the remaining main strings and
tie off following the racquet manufacturers
recommendations.
Follow the manufacturer's recommended
stringing pattern for one or two piece string-
ing. This will determine the starting point for
the cross strings. If applicable, tie the first
cross string using an appropriate starting
knot.
STRINGING THE FRAME
Weaving the Cross Strings
Weave the cross strings over and under the
main strings being careful to alternate the
weave direction of each consecutive cross
string so as to be opposite of the previously
installed cross string.
Completing the String Job
Once the final cross string is tensioned and
clamped, tie off at the appropriate hole
specified by the racquet manufacturer.
Remove the frame from the mounting sys-
tem by loosening the shoulder supports and
frame supports.