System Integrator Tasks
Deliverable
From
To
Comments
Specification
Engineer
S.I
Detail functionality of system
Schedule
Contractor
S.I.
Production Schedule
Manuals
Limitorque
S.I.
Manuals for DDC-100 Operation:
• LMAIM4019 Direct-to-Host Programming
Guide
• LMAIM1329 Accutronix Installation and
Operation for MX-DDC Field Unit
• LMAIM4029 DDC-100 UEC Field Unit
(Modbus) Installation and Operation Manual
• LMAIM4030 DDC-100 UEC Field Unit Instal-
lation and Commissioning Manual
• LMAIM4022 DDC-100 UEC Field Unit
Wiring and Startup Guidelines
• Modicon Modbus Protocol Reference Guide
PI-MODBUS-300 Rev. G (available from
Modicon)
Hardware for
system development Contractor
S.I.
Hardware may include: DDC-100 Field Units,
RS-232/485 converters
Fourth-Party
Hardware/Software
Component supplier
S.I.
Modbus interface modules, Modbus drivers,
non-Limitorque converters, or surge
suppression
Actuator
Contractor
S.I.
Availability of DDC-100 Field Unit for testing
developed application software
Site Preparation
Contractor
S.I.
Complete actuator or field unit installation.
Provide actual (as installed) site loop diagram
to System Integrator
Operational System
S.I.
Contractor
Software only (code) or Hardware and
Software (hardware and code)
Documentation
S.I.
Contractor
System Operation and Maintenance Manuals,
Operational characteristics of system,
Network Addresses to equipment tag names
Engineer Tasks
Deliverable
From
To
Comments
Specification
End-user
Engineer
Site and system requirements
Schedule
End-user
Engineer
Production Schedule. Completion dates
Sales Support
Limitorque
Engineer
Information on Limitorque products
Manuals
Limitorque
Engineer
Manuals for DDC-100 Operation:
• LMAIM4019 Direct-to-Host Programming
Guide
• LMAIM1329 Accutronix Installation and
Operation for MX-DDC Field Unit
• LMAIM4029 DDC-100 UEC Field Unit
(Modbus) Installation and Operation Manual
• LMAIM4030 DDC-100 UEC Field Unit Instal-
lation and Commissioning Manual
• LMAIM4022 DDC-100 UEC Field Unit
Wiring and Startup Guidelines
• Modicon Modbus Protocol Reference Guide
PI-MODBUS-300 Rev. G (available from
Modicon)
Project Specification Engineer
Contractor,
S/I, OEM,
Limitorque
Provide operational specifications for all
equipment and service providers
Project Responsi-
bility
Engineer
Contractor
Define which supplier is responsible for each
portion of project
P&ID
Engineer
Contractor
Detailed layout and instructions for building
site. Information should include actuator tag
names, required data points from actuator,
field unit, and field wiring
Site Electrical and
electronics
Engineer
Contractor
Detail site electrical requirements, cable type,
layout, and locations. Voltages available for
equipment
Loop Drawings
Engineer
Contractor
Detail cable routings from Host to each field
device. This defines how the network cable is