3 general arrangement drawing, 9 certification, 10 other relevant documentation and manuals – Flowserve MNV User Manual
Page 46: 1 supplementary user instructions

MNV & MNZ USER INSTRUCTIONS ENGLISH 71569188 11/04
Page 46 of 47
®
8.2.1 MNZ parts list (See section 8.2 for details)
STATIONARY PARTS
Ref No No
required
Description
1
1
Casing
9
1
Suction head
11
1
Stuffing box head
13
5 rings
Packing
17
1
Split gland
25
1
Suction head wearing ring
29
1
Seal cage split
35
1
Line bearing cover
37
1
Thrust bearing cover
51
Grease retainer- out board
51A
1
Grease retainer inboard
59
1
Casing hand hole cover
59A
1
Suction head hand-hole cover
67
1 Set
Adjusting shims
73
2
Casing gasket
73A
1
Casing hand hole cover gasket
73B
1
Suction head hand hole cover gasket
73C
1
Line bearing cover gasket
73D
1
Thrust bearing cover gasket
99
1
Bearing frame
99A
2
Adjusting bolt
125
2
Grease fitting
ROTATING PARTS
Ref No No
required
Description
2
1
Impeller
6
1
Pump shaft
8
1
Impeller wearing ring
14
1
Shaft sleeve
16
1
Line bearing
18
1
Thrust bearing
22
1
Bearing locknut
22A
1
Bearing lock washer
22B
1
Bearing washer
24
1
Impeller nut
38
1
Shaft sleeve O ring
40
2
Seal ring (thrust)
40A
2
Seal ring (Line)
8.3 General arrangement drawing
The typical general arrangement drawing and any
specific drawings required by the contract will be sent
to the Purchaser separately unless the contract
specifically calls for these to be included into the
User Instructions. If these drawings are sent
separately, the Purchaser must retain them with the
User Instructions.
9 CERTIFICATION
Certificates determined from the Contract
requirements are provided with these Instructions
where applicable. Examples are certificates for CE
marking, ATEX marking etc. If required, copies of
other certificates sent separately to the Purchaser
should be obtained from the Purchaser for retention
with these User Instructions.
10 OTHER RELEVANT
DOCUMENTATION AND MANUALS
10.1 Supplementary user instructions
Supplementary instructions such as for a driver,
instrumentation, controller, seals, sealant system etc
are provided as separate documents in their original
format. If further copies of these are required they
should be obtained from the supplier for retention
with these User Instructions.
10.2 Change notes
If any changes, agreed with Flowserve Pump
Division, are made to the product after its supply, a
record of the details should be maintained with these
Use Instructions.