Flowserve VF User Manual
Page 15

VF USER INSTRUCTIONS ENGLISH 71561233 - 11/09
Page 15 de 32
If the pump is set on a tank, make sure that the 
connection flange is perfectly flat and horizontal. If 
the assembling is on a concrete stone or a metallic 
structure, be sure of the flatness and rigidity of the 
unit. 
If the pump is mounted on a recently sunk well, the 
soil round the well may not be stabilized. After 
some times, check perpendicularity and level, and 
if needed, adjust before definitive anchoring. 
The anchoring frame will then be fixed 
provisionally. 
Anchor bolts must be appropriate for the foot bolt 
holes. Use anchor bolts of accepted standards and 
sufficient length so that they may be clamped 
safely in the grout. 
NF E 27 811
Provide sufficient space in the foundation to 
accommodate the anchor bolts. If necessary, 
provide concrete gullets. 
4.2.1 Installation of the pump
4.2.1.1 Erection of hydraulic unit 
a) Install the pump in the position defined in 
figure 1.
b) The last body, fitted with its wear ring and its
bearing liner, shall be help upside down on the 
shims in AA. 
c) Protect the shaft on the entire bearing area
which subsequently receives the jacket, into 
the body. Wedge in B so as to place the shaft 
in its final position in the body. 
d) Engage the shaft, fitted with its last jacket, into
the body. Wedge in B so as to place the shaft 
in its final position in the body. 
FIGURE I
e) As assembly proceeds, coat the assembly
faces with a sealing product.
f) All impellers and jackets (and wells) shall be
locked onto the shaft by means of the nut and 
its lock-crew provided for this purpose. 
g) Tighten the assembly. 
h) Attach then the suction ear. 
i) 
Place the pump in vertical position, resting 
onto its ear, and complete the assembly by 
attaching the discharge cuff. 
j)
Install the intermediate bearing with its liner, 
coated with sealing compound. It shall be 
fastened only at connection of the pump to the 
discharge line. 
 
4.2.1.2 Installation of the hydraulic unit and 
discharge stack 
(see figure 2) 
a) Install collar C on the pump, lift the assembly 
and allow it to rest vertically onto the 
installation plane via the collar. 
b) On ground level and in horizontal position,
engage an intermediate shaft into a riser tube 
by leaving it to protrude by about 250 mm. 
c) Fasten collar C2 to the shaft and to the pipe.
Wedge the shaft at its output from the other 
end of the pipe. Coat the assembly faces of 
the intermediate bearing and of the bottom 
tube with sealing compound. 
Collar C
Collar C2
Collar C1
d) Insert the intermediate bearing, fitted with its
liner, into the bottom shaft fitted with the jacket 
below the liner and the coupling cotter key; 
install in place. 
e) Fasten collar C1 below the opposite flange of
the upper pipe; collar C1 shall be used to lift 
the assembly and position it vertically with the 
shafts aligned. 
