beautypg.com

DR Power Redi-Plow Plus (Sept. 2013 - Present) User Manual

Page 8

background image

8

DR

®

REDI-PLOW™ PLUS

10. Place each side hinge on blade and align edge of hinge with factory mark on

blade (Figure 10).

11. When both hinges are properly aligned – they should measure 22 1/2" apart

(Figure 11).

12. At end of blade, insert two square nuts in each channel – flat side facing out.

Slide nuts over to hinge and align them with holes at top and bottom (Figure
12
).

13. Turn 3/8" x 3/4" hex bolts with flat washer into nuts on top section of blade

and leave loose (Figure 13). Turn 3/8" x 3/4" hex bolts into nuts on bottom
section of blade and leave loose.

14. Make sure slide hinge is lined up with mark (Figure 10). Using 9/16"

wrench, tighten hex bolts in top section first (Figure 14). Then tighten hex
bolts on bottom section.

15. Using 5/16" bit, drill a hole through blade in each factory punched hole on

slide hinge (Figure 15). Turn a (short) 3/8" self threading bolt into each
drilled out hole and tighten. Repeat steps to attach opposite slide hinge.

22-1/2"

Figure 11

Align this edge of each Slide
Hinge with Factory mark

Slide Hinge

Factory Marks
on Blade
22-1/2" apart

Figure 10

Align edge
with Factory
Mark

Figure 12

Align Square Nut here at bottom

Align Square
Nut here at top

Bottom
Hex Head
Bolt
w/Flat
Washer

Figure 13

Top Hex Head Bolt w/Flat
Washer (loose for now)

Tighten these
bolts second

Figure 14

Tighten these
bolts first

Factory
Hole in
Slide
Hinge

Figure 15

Drill 5/16" Hole
in Blade