beautypg.com

Connecting load cells to j-box, Changing setup and calibration numbers, Setup – Digi-Star EZ3400(V) User Manual

Page 38

background image

Installation

D3714-GB Rev B EZ3400(V) User' s manual

34

Connecting load cells to J-Box

Figure4: J-Box connections



Changing setup and calibration numbers

[

SETUP.] & [CAL.]

1. Enter 871.

2. Press .

3. Weighing indicator briefly shows

SETUP

followed by a six digit number. Enter the
new number.

4. Press

.


Use 872 and follow the same procedure to
change the calibration

CAL number.

Connect load cell wires

to terminals.

Tighten nuts

Load cell cable

J-Box cable

Wire colours

Pin Colour

Description

1 Red

Power supply
+

2 Green

Signal -

3 White

Signal +

4 Black

Power supply

J-Box illustrated for
connection of 4 load cells

Connect to bottom panel of weighing
indicator. See figure 3.

1/3

2

SETUP

4

3

This manual is related to the following products: