Inspecting the equipment, Included parts, 2 inspecting the equipment – Comtech EF Data CST-5000 User Manual
Page 30: 1 included parts
Single Thread System Installation
CST-5000 C-Band Satellite Terminal
2–2
Rev. 9
2.2 Inspecting the Equipment
1. Carefully check the equipment for potential damage incurred during shipment.
2. Carefully check the equipment against the packing list shipped with the
equipment to ensure that the shipment is correct and complete.
2.2.1 Included Parts
A typical single thread CST-5000 configuration contains the following components.
Notes:
1. Parts are not drawn to scale.
2. Because each system can be custom ordered, it is beyond the scope of this
manual to provide the unlimited configuration possibilities.
3. This chapter does not describe the installation procedures for amplifiers, high
performance LNAs, phase-locked LNBs, LNBs, and phase-locked block
converters.
Qty.
Description
Qty.
Description
1
RFT outdoor unit.
1 Feed
assembly.
RF
IN
RF
O
U
T
MO
D
E
L
N
O
.
SER
IA
L
N
O
.
FR
E
Q
U
E
N
C
Y
N
O
IS
E
T
EM
P
G
AI
N
Note: Pictured is a typical LNA. Other LNAs are
available, and can be ordered from an EFData
marketing representative.
1
Envelope containing the test data sheet.
1 CST-5000
installation
and operation manual.
1
Monitor and Control Software for EFData Satellite
Terminals User’s Guide.
1
LNA connector kit (EFData Part # KT/2721), which includes: