4 schematic diagram, 5 installation, 6 rh-8 installation – Cloud Electronics PS16 User Manual
Page 4
Pump Station 16-R: Installation and operation manual
3
4 Schematic
Diagram
Pump Station 16-R & Sub Station 16-R
5 Installation
The Cloud Pump Station 16-R is suitable for mounting in a standard 19” equipment rack where
it will occupy two units of rack space. The Pump Station 16-R is 170mm deep, but a depth of
235mm should be allowed to clear the rear panel connectors. When possible, avoid positioning
the unit in close proximity to magnetic fields or equipment operating at a high temperature. The
Pump Station 16-R operates from an external plug-top transformer and a provision should be
made to plug this into a suitably positioned power socket. The Pump Station 16-R is fitted with
an RJ45 socket for each remote control unit; terminate using eight core category 5 cable (4 pair
Cat 5). The total cable length from an RH-8 to the rack should not exceed 100m (328ft).
6 RH-8
Installation
When installing the RH-8 we suggest that an RJ45 data socket is
floor mounted adjacent to each one. Wire each data socket
individually back to the equipment rack pin to pin using CAT 5
cable. The RH-8 is fitted with an RJ45 compatible data socket
and supplied with a 3m patch cord to link to the floor mounted
data socket; this approach simplifies maintenance.
Cable Information for Wiring the RH-8 to a Floor Socket
RH-8 (RJ45)
Pump Station 16-R (RJ45)
CAT 5*
Pin 8
Pin 8
Brown/White
Pin 7
Pin 7
White/Brown
Pin 6
Pin 6
Green/White
Pin 5
Pin 5
White/Blue
Pin 4
Pin 4
Blue/White
Pin 3
Pin 3
White/Green
Pin 2
Pin 2
Orange/White
Pin 1
Pin 1
White/Orange
16-07-02 V2.1