beautypg.com

Operation 4 – Belshaw Adamatic TG50 Thermoglaze User Manual

Page 12

background image

Belshaw Bros., Inc.

• www.belshaw.com • Phone 206-322-5474 • Fax 206-322-5425

6 MN-1720

Thermoglaze

50

Operation 4


• Turn on oven power switch and allow to heat

to operating temperature. (Note: conveyor
will not move until the oven is up to
operating temperature and the donut
ready light is on. See Figure 4-1.)

Figure 4-1. Oven Ready Light.

• Load glaze reservoir with 40 pounds (one

large bucket) of glaze and turn on the glaze
pump.

WARNING

Do not operate glazer without glaze or water

in the pump. Doing so can cause permanent

damage to the pump.

• After the donuts have been in the

Thermolizer for at least 20 minutes (60
minutes for filled product), turn on glazer
using the on switch located on the main
control panel.

• After the donuts are thawed, place a screen of

donuts from Thermolizer box to the infeed
end of the Thermoglaze conveyor and allow
the screen to travel through the oven and
glazer. This takes approximately 1-1/2 to 3
minutes.

• When the screen of donuts is through the

glazer and stopped forward travel, place the
glazed product on a rack for cooling using
the 2 delrin tray grips provided with the unit.

WARNING

To avoid burning yourself, never touch the

Thermoglaze unit, conveyor, or interior of the

oven while the machine is in use.

WARNING

Thoroughly clean and dry the floor if water or

other materials are spilled. Materials spilled

on the floor may cause serious injury and loss

of life.

WARNING

Conveyor will automatically start when

Thermoglaze reaches operating temperature.

CAUTION!

Donut screens are hot after coming out of the

glazer and will burn you if you grab them

without the handles.

CAUTION!

To avoid burning yourself, never touch the

hot infeed oven end panel when the machine

is in operation.