2 mechanical installation – Beisler 1220-4 User Manual
Page 22

Operating manual Automatic single head serging unit 1220/4
Page 5-2
© Beisler GmbH, Hösbach
5.2 Mechanical
installation
ATTENTION
Check before starting the installation, whether the desired location
meets the requirements (see chapter 5.1, technical data). This is very
important regarding the stability of the ground.
5.2.1
Unpack and put up
1. Remove the packing material and possible transportation
protections.
2. Position the machine on a solid and horizontal ground.
3. Level the machine to a horizontal stand using the adjustable
frame feet.
5.2.2
Connection of air supply
C
B
A
Pict.. 3
Connection of air supply (machine backside)