Basler Electric BE1-40Q User Manual
Page 6

iv
BE1-40Q Introduction
9171500990 Rev N
Manual
Revision and Date
Change
F, 01/91
Pages 1-3, 1-5 (Style Chart), 1-7 2-1 (Item H), 4-4 (step 3), 4-7 (Step
3): Time delay range is 0.1 to 9.90 seconds, adjustable in increments
of 0.1 seconds. This was previously unclear or (in some cases)
erroneous.
Page 1-8: RFI specification added.
Pages 1-6, 5-1: minor editing.
E, 09/90
Legend of Figure 3-2 corrected.
Page 3-1 (under “Phase Shift”): 68 was 52.
D, 08/89
Equations 4.1 through 4.4 put into standard form by removing
negative sign from the angle theta.
C, 06/89
Figure 3-2 corrected.
Equations on page 4-8 restated for clarification.
Arithmetical errors corrected in the example given on page 4-8.
Table 4-2 corrected.
Figure 4-3 was reformatted.
Figure 4-7 revised to clarify installation.
B, 11/88
Minor corrections and editing.
A, 11/88
Figure 3-3 added.
Editing changes made to clarify specifications.
Two articles added to Section 4, entitled, “Setting the Pickup” (page
4-5) and, “Relay Characteristic Verification” page 4-7.
—, 01/86
Initial release