Tove, Nstallation – Avalon Firestyles 900 PI-1993 to 1996 User Manual
Page 15
![background image](https://www.manualsdir.com/files/772767/content/doc015.png)
S
TOVE
I
NSTALLATION
(C
ONT
.)
P
AGE
15
Exterior Vertical Installation
This type of installation utilizes natural draft while concealing the vent outside. Make sure to
follow all of the requirements listed in the section "Stove Requirements" as well as those listed
below in the illustration. The steps below detail the order of installation.
A
Install the floor protection.
B
Install the pellet vent. The pellet vent may pass through the roof before termination or
turn sideways and terminate along an outside wall (see the illustration below). Make sure
to follow the pellet vent manufacturer's instructions for passing the vent through
combustible walls or roofs. Screw together all pellet vent joints and seal. Install the
outside air connection (if applicable).
C
Place the pellet stove in position and attach the pellet vent and outside air connection (if
applicable). Screw together and seal the pellet vent connection to the stove.
D
Read the section "Operating the Heater" prior to plugging in the stove and operating.
Sidewall
Floor protection
9"
Min.
0"
0"
3"
Min.
Backwall
Outside
Air
3"
Min.
3"
Min.
Approved
thimble
Type
"L" Vent
Joints must be
screwed together
and sealed
Support
bracket
every 5'
3" Clearance
Min.2'
3"
Min.
Tee or
90 elbow
6"
Min.
Flashing
Outside Air
2'
Min.
If the termination is
below the eave, it must
maintain a 2' clearance
1'
Min.