Tove, Nstallation – Avalon Firestyles 900 PI-1993 to 1996 User Manual
Page 13
S
TOVE
I
NSTALLATION
(C
ONT
.)
P
AGE
13
Horizontal Installation
The horizontal installation minimizes the amount of pellet vent needed by passing the pellet vent
through the wall with a thimble. Make sure to follow all of the requirements listed in the section
"Stove Requirements" as well as those listed below in the illustration. The steps below detail the
order of installation.
HINT:
Make sure to carefully plan the pellet vent route so that it always
maintains a 3" clearance to combustibles.
A
Install the floor protection.
B
Install the pellet vent. Make sure to follow the pellet vent manufacturer's instructions for
passing the vent through combustible walls. Screw together all pellet vent joints and seal.
Install the outside air connection (if applicable).
WARNING: Because this type of installation does not have any vertical rise to
create draft, we recommend using outside air with this type of
installation.
C
Place the pellet stove in position and attach the pellet vent and outside air connection (if
applicable). Screw together and seal the pellet vent connection to the stove.
D
Read the section "Operating the Heater" prior to plugging in the stove and operating.
Sidewall
Door
Opening
Floor protection
6"
Min.
9"
Min.
0"
0"
3"
Min.
Backwall
Outside
Air
1'
Min.
Approved
thimble
3"
Min.
Type
"L" Vent
Joints must be
screwed together
and sealed
45 elbow
pointed down or
pellet vent cap
Outside Air
Outside Air Termination
with 90 elbow or hood
Floor protection