beautypg.com

Connector pin assignments, 1 overview, 2 p2 connector – Artesyn MVME7616E Transition Module Installation and Use (April 2015) User Manual

Page 41: 1 overview 4.2 p2 connector, Table 4-1, P2 connector pin assignments, S. see, Chapter 4, connector pin assignments, Chapter 4

background image

Chapter 4

MVME7616E Transition Module Installation and Use (6806800A43D)

41

Connector Pin Assignments

4.1

Overview

This chapter provides the pin assignments for the P2 connector and front panel port
connectors on the MVME761 transition module, as well as for the SCSI and PMC I/O connectors
on the P2 adapters.

4.2

P2 Connector

Signaling and power from the host VMEmodules are received through connector P2, a 64-pin
DIN connector. Because the P2 adapter reroutes some of the signals, connector P2 on the
MVME761 transition module is not pin-for-pin compatible with connector P2 on the host
VMEmodules.

The pin assignments and signal mnemonics for the MVME761 transition module P2 connector
are listed in the following table.

Table 4-1 P2 Connector Pin Assignments

Row A Pins

Row C Pins

Pin

Signal

Pin

Signal

1

C- (R- for RJ-45 J9)

1

C+ (R+ for RJ-45 J9)

2

T-

2

T+

3

R-

3

R+

4

+12VF

4

PRSTB#

5

GND

5

PRD0

6

PRD1

6

PRD2

7

PRD3

7

PRD4

8

PRD5

8

PRD6

9

PRD7

9

GND

10

PRACK#

10

GND

11

PRBSY

11

PRPE

12

PRSEL

12

INPRIME#

13

PRFAULT#

13

GND