AMETEK HPD Series Operation Manual User Manual
Page 21
Section 2. Installation
Introduction
This section provides recommendations and procedures for inspecting, installing,
and testing the power supply.
Basic Setup Procedure
Table 2.1 Basic Setup Procedure
Step# Description Action
Reference
1
Inspection
Perform an initial physical
inspection of the supply.
2
Installation
Install the supply and
ensure adequate ventilation.
3
Test
Perform functional tests for
voltage mode operation,
current mode operation, and
front panel controls.
“Initial Inspection” on page 9
“Location and Ventilation” on
page 10
“Functional Tests” on page 12
Initial Inspection
Verify that the power supply was shipped with an IEC power cord set appropriate to
the destination country, two 2-position terminal block jumpers, and an operating
manual. When you first receive your unit, perform a quick physical check.
1. Inspect the unit for scratches and cracks, broken switches, connectors, terminals,
and missing accessories.
2. Have a service technician check the unit if you suspect internal damage.
If the unit is damaged, save all packing materials and notify the carrier immediately.
Periodic
Cleaning
No routine servicing of the power supply is required except for periodic cleaning.
Whenever a unit is removed from operation, clean the outside surfaces with a weak
solution of soap and water. If required, use low-pressure compressed air to blow dust
from in and around components on the printed circuit boards.