3 start disconnect test – Xtramus NuApps-POE V1.0 User Manual
Page 32
28
E-Mail: [email protected]
Http://www.
X
tramus.com
XTRAMUS TECHNOLOGIES®
put the title in chart.
Re-start the test by clicking the Test button; save the current chart by clicking the
Save Chart button; exit the chart by clicking the Close button.
6.5.3 Start Disconnect Test
For Disconnect Test, the report shows T off (ms) and Test Result (Success/Fail).