6 setup overload test – Xtramus NuApps-POE V1.0 User Manual
Page 28
24
E-Mail: [email protected]
Http://www.
X
tramus.com
XTRAMUS TECHNOLOGIES®
6.4.6 Setup Overload Test
Set up the pulse load and the idle load for overload configuration. Pulse load refers to
the maximum value once the power shoots up while idle load refers to the lowest
value when loading drops off.