5 start test, 1 start dynamic loading, 2 start connect test – Xtramus NuApps-POE V1.0 User Manual
Page 30
26
E-Mail: [email protected]
Http://www.
X
tramus.com
XTRAMUS TECHNOLOGIES®
6.5 Start Test
There are two places to start any test: choose from the popup menu or click the small
figure from the bottom of the chassis panel.
6.5.1 Start Dynamic Loading
The indicator
for the dynamic loading from the virtual panel will appear to indicate
the port(s) is/are running dynamic loading test.
6.5.2 Start Connect Test