beautypg.com

d&b Vi User Manual

Page 31

background image

5. At the rear, align the Rear link with the hole of the TOP

cabinet's Splay link.

6. Reinsert the fixing bolt.
7. Insert and lock the ring cotter.

8. Check the assembly
Before hoisting the array to its operating position, recheck the

actual status of the entire assembly according to the checklist given

in Þ Chapter 4. "Safety and system checks" on page 32.

d&b Vi Rigging manual (1.2 EN)

31

This manual is related to the following products: