d&b Vi User Manual
Page 27
4. Attach the Splay link to its new position and insert the fixing
bolt.
5. Secure the fixing bolt using the ring cotter and ensure the ring
cotter is properly locked.
2. Prepare the first SUB cabinet
1. Prepare the Front links of the first cabinet as described in
Þ Chapter 2. "Rigging concept and components",
Þ "Cabinet's rigging mechanism" .
2. At the rear top, release both Locking pins.
3. Attach the Flying frame to the first SUB cabinet
1. Lower the frame onto the cabinet until the Front links fit into the
slots at the front of the frame.
2. Insert the second Locking pins of the cabinet's Front links on
both sides.
3. On the rear rigging strand of the cabinet, release both Locking
pins.
4. Fold the Splay link into the rigging strand and reinsert the
Locking pins.
d&b Vi Rigging manual (1.2 EN)
27