Þ attaching the splay/rear links and the o-ring on – d&b Vi User Manual
Page 15

Attaching the Splay/Rear links and the O-ring
The assembly of both the Rear links and the O-ring is carried out in
the following manner:
1. Attach the corresponding item to its dedicated position.
Note: In connection with the bottom frame's Rear link,
observe the direction of attachment as shown in the previous
section Þ "Splay/Rear link positions" on page 14, following
2. Insert the Fixing bolt.
3. Insert and lock the Ring cotter.
Changing the Splay/Rear link position on Vi Mounting
frames
To change the Rear link position, follow the previous assembly
instructions in reverse order. The procedure for the top frame is
described as an example. The same procedure applies to the
bottom frame.
However, in connection with the bottom frame's Rear link, observe
the direction of attachment as shown in the previous section Þ
"Splay/Rear link positions" on page 14, following Fig. 5 and
1. Unlock and remove the ring cotter of the fixing bolt.
2. Pull out the fixing bolt and remove the Rear link.
3. Attach the Rear link to its new position and insert the fixing
bolt.
4. Secure the fixing bolt using the ring cotter and ensure the ring
cotter is properly locked.
d&b Vi Rigging manual (1.2 EN)
15